top of page

The Village of Lake Zurich has placed a $20.3 million bond referendum on the November 3, 2026 ballot to replace the Fire Department's outdated, 46-year-old Station 1 with a new facility at a new, Village-owned location.

​

Protect. Respond. Support. Sustain.

Protect — Reduce firefighters' exposure to harmful carcinogens and other toxins. 

Respond — Improve emergency response times. 

Support — Create safe, compliant facilities for today's full-time, coed workforce.

Sustain — Improve energy efficiency and reduce ongoing operating and maintenance costs.

Conceptual Renderings

Why a New Station is Needed

Existing Station 1 no longer meets today's safety, health, or operational standards.

Built in 1980 for a volunteer department — not today's full-time staff

Repeated flooding and roof leaks

Aging electrical, HVAC, and plumbing systems

No separation between clean and contaminated areas

Outdated bunk rooms, lacking privacy and coed accommodations for female staff

No elevator to the training room; limited ADA access

Public access directly into living and apparatus areas

Site conditions mean renovation can’t fix these issues

What the Bond Would Fund

A new Station 1 featuring:

Hot Zone contamination-control layout

Updated HVAC, electrical, plumbing, and roofing

Full ADA accessibility

Safer, more efficient apparatus bays

Energy-efficient building systems

Individual bunk rooms, restrooms, and showers for both male and female staff

More storage and workspace

Community training room

Flexible design for future staffing models

Recurring flooding and drainage issues

Recurring flooding and drainage issues. 

Outdated bunk rooms

Outdated bunk rooms lack privacy and are located near the apparatus bay, impacting firefighter health and wellness. 

storage challenge

Insufficient space to separate clean and contaminated areas.

Why Vote Yes

Faster 911 Response

Reduced Cancer Risk for Firefighters

Reliable, Updated Building Systems

Improved ADA Accessibility

Practical, Affordable Investment

Stronger Recruitment & Retention

Long-Term Efficiency & Cost Savings

First-Ever Fire Station Referendum for the Village

Protects Local Property Values

VOTE YES to improve response times and reduce firefighter cancer risk with a new Station 1. 

Proposed New Station 1

Location Matters

Proposed New Location: Route 22 & South Old Rand Road

Village already owns the site

No expected negative traffic impact

Faster, more direct emergency routes

Identified as the optimal location to improve response times

Expected to open late 2028 / early 2029

Surrounded by commercial/industrial uses, away from homes

Current site could become part of the adjacent Ela Township community center

Cancer Prevention Matters

According to major industry reports:

Firefighters are 9% more likely to be diagnosed with cancer than the general public

Firefighters are 14% more likely to die from cancer

72% of firefighter line-of-duty deaths are cancer-related

The proposed new station would incorporate a Hot Zone layout, helping reduce the risk of cancer for our firefighters.

Response Times Matter

When you call 911, every second counts

Survival rates drop with each passing minute, especially in medical emergencies

Faster response times can save lives

Financing Matters

20-year, $20.3M bond measure

Estimated tax impact is $195/year or $16.26/month for a $450K home

Delaying increases cost due to construction inflation

Hot Zone Layouts Matter

Firefighters can carry are smoke, soot, and diesel exhaust back to the station on their gear and equipment. A Hot Zone layout keeps that contamination contained:

Hot Zone: Apparatus bays, areas where contaminated gear first enters

Transition Zone: Decontamination, laundry, showers

Clean Zone: Living and wellness spaces, offices, training room

Hot Zone layout

Recruitment & Retention Matters

Modern facilities are now the baseline for recruits

Neighboring departments have already modernized

Outdated conditions make hiring and retention harder

A new station would support long-term staffing stability

The Bottom Line

Station 1 was built in a different era, and for a volunteer force. Now, 46 years later, it no longer meets the needs of our full-time fire department.

A new station would fix what renovation can't. It would help improve response times, reduce firefighter cancer risk, and deliver a modern station built to serve our community for decades to come. 

Response times matter. Firefighter health and safety matters. 

Show Your Support.

Give Your Support.

Donations will help cover the cost of yard signs and other campaign tools to effectively get the word out. Any amount is greatly appreciated.

Stay Informed.

*By providing your phone number, you consent to receive text message updates, including automated text message updates, from Citizens for Lake Zurich Referendum at that number. Message and data rates may apply. Reply STOP to opt out at any time.

bottom of page